Chapter 5
Turn Up Network
Figure 5-1
flows from Slot 5/Node 1 to Slot 5/Node 2, and from Slot 12/Node 2 to Slot 12/Node 3. Slots 6 and 13
contain the protect OC-N cards. Slots 5 and 6 and Slots 12 and 13 are in 1+1 protection.
Figure 5-1
Node 1
Click the Provisioning > Protection tabs. Verify that 1+1 protection is created for the OC-N cards at
Step 2
the node. If the protection group has not been created, complete the
Group" task on page
Repeat Steps
Step 3
Verify that the working and protect cards in the 1+1 protection groups correspond to the physical fiber
Step 4
connections between the nodes, that is, working cards are fibered to working cards and protect cards are
fibered to protect cards.
Complete the
Step 5
OC-N ports on each linear ADM node. Alternatively, if additional bandwidth is needed for CTC
management, complete the
Note
Note
As needed, complete the
Step 6
As needed, complete the
Step 7
Step 8
As needed, complete the
Verify that the timing has been set up at each linear node. If not, complete the
Step 9
procedure on page
Step 10
Complete the
Stop. You have completed this procedure.
December 2004
shows three ONS 15454s in a linear ADM configuration. In this example, working traffic
Linear ADM Configuration
Slot 5 to Slot 5
Slot 6 to Slot 6
17-81.
1
and
2
for all other nodes that you will include in the linear ADM.
"DLP-A377 Provision Section DCC Terminations" task on page 20-61
"DLP-A378 Provision Line DCC Terminations" task on page
If linear ADM nodes are not connected to a LAN, you will need to create the DCC terminations
using a direct (craft) connection to the node. Remote provisioning is possible only after all nodes
without LAN connections have DCC terminations provisioned to in-service OC-N ports.
Terminating nodes (Nodes 1 and 3 in
intermediate nodes (Node 2 in
the example).
"DLP-A380 Provision a Proxy Tunnel" task on page
"DLP-A381 Provision a Firewall Tunnel" task on page
"DLP-A367 Create a Provisionable Patchcord" task on page
4-9. If a node is using line timing, use its working OC-N card as the timing source.
"NTP-A174 Linear ADM Network Acceptance Test" procedure on page
Slot 12 to Slot 12
Slot 13 to Slot 13
Node 2
Figure
5-1) will have one DCC termination, and
Figure
5-1) will have two DCC terminations (Slots 5 and 12 in
Cisco ONS 15454 Procedure Guide, R5.0
NTP-A38 Provision a Linear ADM Network
Node 3
Protect Path
Working Path
"DLP-A73 Create a 1+1 Protection
for the working
20-62.
20-63.
20-64.
20-51.
"NTP-A28 Set Up Timing"
5-8.
5-7