Chapter 20
DLPs A300 to A399
Figure 20-16
If available, tie wrap or lace the cables to the tie bar according to Telcordia standards (GR-1275-CORE)
Step 5
or local site practice.
Note
Return to your originating procedure (NTP).
Step 6
March 2005
Partially Cabled UBIC-V
When routing the electrical cables, be sure to leave enough room in front of the alarm and timing
panel so that it is accessible for maintenance activity.
DLP-A386 Install Electrical Cables on the UBIC-V EIAs
Cisco ONS 15454 Procedure Guide, R5.0
20-73