NTP-A151 Modify and Delete Circuits
NTP-A151 Modify and Delete Circuits
Purpose
Tools/Equipment
Prerequisite Procedures Circuits must exist on the network. See
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
want to modify. If you are already logged in, continue with Step 2.
As needed, complete the
Step 2
As needed, complete the
Step 3
As needed, complete the
Step 4
As needed, complete the
Step 5
As needed, complete the
Step 6
Timer" task on page
As needed, complete the
Step 7
As needed, complete the
Step 8
As needed, complete the
Step 9
Step 10
As needed, complete the
Stop. You have completed this procedure.
NTP-A278 Modify and Delete Overhead Circuits
Purpose
Tools/Equipment
Prerequisite Procedures Circuits must exist on the network. See
Required/As Needed
Onsite/Remote
Security Level
Caution
Deleting circuits can be service affecting and should be performed during a maintenance window.
Complete the
Step 1
to delete the circuit. If you are already logged in, continue with Step 2.
Cisco ONS 15454 Procedure Guide, R5.0
9-4
This procedure modifies and deletes ONS 15454 circuits and tunnels.
None
Tunnels"
for circuit creation procedures.
As needed
Onsite or remote
Provisioning or higher
"DLP-A60 Log into CTC" task on page 17-66
"DLP-A230 Change a Circuit Service State" task on page
"DLP-A231 Edit a Circuit Name" task on page
"DLP-A232 Change Active and Standby Span Color" task on page
"DLP-A233 Edit Path Protection Circuit Path Selectors" task on page
"DLP-A263 Edit Path Protection Dual-Ring Interconnect Circuit Hold-Off
19-45.
"DLP-A333 Delete Circuits" task on page
"DLP-A437 Change a VCAT Member Service State" task on page
"DLP-A384 Add a Member to a VCAT Circuit" task on page
"DLP-A385 Delete a Member from a VCAT Circuit" task on page
This procedure changes the tunnel type, repairs IP circuits, and deletes
overhead circuits.
None
Tunnels."
As needed
Onsite or remote
Provisioning or higher
"DLP-A60 Log into CTC" task on page 17-66
Chapter 9
Chapter 6, "Create Circuits and VT
at a node containing the circuit that you
19-19.
19-20.
20-21.
Chapter 6, "Create Circuits and VT
for a node on the network where you want
Manage Circuits
19-21.
19-22.
21-15.
20-65.
20-69.