DLP-A442 Verify Pass-Through Circuits
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
In the CTC Circuits window, choose a circuit that passes through the node that will be removed and click
Step 1
Edit.
In the Edit Circuits window, check Show Detailed Map.
Step 2
Step 3
Verify that the STS and VT mapping on the node's east and west ports are the same. For example, if the
circuit mapping on the west port is s5/p1/S1 (Slot 5, Port 1, STS 1), verify that the mapping is STS 1 on
the east port. If the circuit displays different STSs and/or VTs on the east and west ports, record the name
of the circuit.
Figure 21-2
Step 4
Repeat Steps
Delete and recreate each circuit recorded in Step 3. To delete the circuit, see the
Step 5
Circuits" task on page
Return to your originating procedure (NTP).
Step 6
March 2005
This task verifies that circuits passing through a node enter and exit the
node on the same STS and/or VT.
None
DLP-A60 Log into CTC, page 17-66
As needed
Onsite or remote
Provisioning or higher
Figure 21-2
shows a circuit passing through a node (doc-124) on the same STS (STS 2).
Verifying Pass-Through STSs
1
to
3
for each circuit in the Circuits tab.
20-21. To create the circuit, see
DLP-A442 Verify Pass-Through Circuits
"DLP-A333 Delete
Chapter 6, "Create Circuits and VT Tunnels."
Cisco ONS 15454 Procedure Guide, R5.0
21-23