Cisco ONS 15454 Series Procedure Manual page 243

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Chapter 6
Create Circuits and VT Tunnels
Provision the circuit source:
Step 11
From the Node drop-down list, choose the circuit source node. Either end node can be the
a.
point-to-point circuit source.
From the Slot drop-down list, choose the slot containing the G-Series card that you will use for one
b.
end of the point-to-point circuit.
From the Port drop-down list, choose a port.
c.
Click Next.
Step 12
Provision the circuit destination:
Step 13
From the Node drop-down list, choose the circuit destination node.
a.
From the Slot drop-down list, choose the slot containing the card that you will use for other end of
b.
the point-to-point circuit.
c.
From the Port drop-down list, choose a port.
Step 14
Click Next.
Step 15
In the left pane of the Circuit Routing Preferences panel, confirm that the following information is
correct:
Circuit name
Circuit type
Circuit size
ONS nodes
If the information is not correct, click the Back button and repeat Steps
Step 16
information. If the information is correct, check Route Automatically.
Leave all other boxes in the Circuit Routing Preferences panel at the defaults, unless your site plan
Step 17
dictates otherwise.
Click Finish.
Step 18
Note
Complete the
Step 19
Stop. You have completed this procedure.
August 2005
To change the capacity of a G-Series circuit, you must delete the original circuit and reprovision
a new larger circuit.
"NTP-A149 Test G-Series Circuits" procedure on page
NTP-A147 Create a G-Series STS Circuit
6
through
15
6-81.
Cisco ONS 15454 Procedure Guide, R5.0
with the correct
6-75

Advertisement

Table of Contents
loading

Table of Contents