Dlp- A39 Install Ethernet Cards - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

DLP-A39 Install Ethernet Cards
Return to your originating procedure (NTP).
Step 6
DLP-A39 Install Ethernet Cards
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Open the card latches/ejectors.
Step 1
Use the latches/ejectors to firmly slide the card along the guide rails until the card plugs into the
Step 2
receptacle at the back of the slot.
Verify that the card is inserted correctly and close the latches/ejectors on the card.
Step 3
Note
Verify the LED activity:
Step 4
For E-Series, G-Series and ML-Series cards:
For CE-100T-8 card:
Cisco ONS 15454 Procedure Guide, R5.0
17-48
If the red FAIL LED is on continuously or the LEDs act erratically, the card is not installed
Note
properly. Remove the card and repeat Steps
This task installs the Ethernet cards (E100T-12, E100T-G, E1000-2,
E1000-2-G, G1000-4, G1K-4, ML100T-12, ML1000-2, and CE-100T-8).
Ethernet cards
NTP-A15 Install the Common Control Cards, page 2-2
As needed
Onsite
None
It is possible to close the latches/ejectors when the card is not completely plugged into the
backplane. Ensure that you cannot insert the card any further.
The red FAIL LED turns on for 20 to 30 seconds.
The red FAIL LED blinks for 35 to 45 seconds.
All LEDs blink once and turn off for 1 to 5 seconds.
The ACT or ACT/STBY LED turns on. The SF LED can persist until all card ports connect to their
far end counterparts and a signal is present.
The red FAIL LED blinks for 25 to 30 seconds and then turns off.
The red FAIL LED blinks again for 55 to 60 seconds.
All LEDs turn on for 1 to 5 seconds.
The ACT LED turns on. The SF LED can persist until all card ports connect to their far end
counterparts and a signal is present.
If the red FAIL LED does not turn on, check the power.
Note
Chapter 17
1
to 5.
DLPs A1 to A99
March 2005

Advertisement

Table of Contents
loading

Table of Contents