Ntp- A155 Convert A 1+1 Point-To-Point Or A Linear Adm To A Two-Fiber Blsr Manually - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Chapter 13
Convert Network Configurations
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Optical transmit and receive levels should be in their acceptable range as shown in
Note
page
2-15.
Traffic is not protected during this procedure.
Caution
Complete the
Step 1
from a point-to-point or ADM to a BLSR. If you are already logged in, continue with Step 2.
According to local site practice, complete the
Step 2
page 15-4
Complete the
Step 3
On the network map, right-click a span adjacent to the node you are logged into. A shortcut menu
Step 4
appears.
From the shortcut menu, click Circuits. The Circuits on Span window appears.
Step 5
Verify that the total number of active STS circuits does not exceed 50 percent of the span bandwidth. In
Step 6
the Circuits column there is a block titled "Unused." This number should exceed 50 percent of the span
bandwidth.
Note
Caution
If the upper STSs are in use, this procedure cannot be completed. Bandwidth must be 50 percent
unassigned to convert to a BLSR. Refer to local procedures for relocating circuits if these requirements
are not met.
Repeat Steps
Step 7
BLSR. When all nodes comply with
For every node in the point-to-point or linear ADM network that you want to convert to a BLSR,
Step 8
complete the following tasks:
Complete the
a.
1+1 protection group that supports a span in the point-to-point or linear ADM network.
Complete the
b.
the point-to-point or linear ADM span.
Complete the
c.
ports out of service at each node that supports the point-to-point or linear ADM span.
December 2004
NTP-A155 Convert a 1+1 Point-to-Point or a Linear ADM to a Two-Fiber BLSR Manually
NTP-A124 Provision a Point-to-Point Network, page 5-3
NTP-A38 Provision a Linear ADM Network, page 5-6
As needed
Onsite
Provisioning or higher
"DLP-A60 Log into CTC" task on page 17-66
for each node in the configuration.
"DLP-A298 Check the Network for Alarms and Conditions" task on page
If the span is an OC-48, no more than 24 STSs can be provisioned on the span. If the span is an
OC-192, no more than 96 STSs can be provisioned on the span. If the span is an OC-12, no more
than 6 STSs can be provisioned on the span.
4
through
6
for each node in the point-to-point or linear ADM that you will convert to a
"DLP-A189 Verify that a 1+1 Working Slot is Active" task on page 18-60
"DLP-A155 Delete a Protection Group" task on page 18-23
"DLP-A214 Change the Service State for a Port" task on page 19-9
at one of the nodes that you want to convert
"NTP-A108 Back Up the Database" procedure on
Step
6, proceed to the next step.
Cisco ONS 15454 Procedure Guide, R5.0
or
Table 2-3 on
19-63.
for every
at each port that supports
to put the protect
13-9

Advertisement

Table of Contents
loading

Table of Contents