Dlp- A30 Install Ferrites To Power Cabling - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Chapter 17
DLPs A1 to A99
When routing the long UBIC-H combination 735/734 cables, do not stretch or force them by pulling on
Caution
one end. They must be properly laid into the cable racks to prevent the splices from being broken or
shorted.
Note
Step 3
Return to your originating procedure (NTP).
DLP-A30 Install Ferrites to Power Cabling
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Wrap the cables once around and through the block ferrites and pull the cables straight through the oval
Step 1
ferrites.
Place the oval ferrite as close to the power terminals as possible, between the ONS 15454 and the block
Step 2
ferrite, as shown in
the power terminals.
Figure 17-18
Power terminals
Return to your originating procedure (NTP).
Step 3
March 2005
SMB EIAs feature cable-management eyelets for tie wrapping or lacing cables to the cover
panel.
This task attaches ferrites to power cabling. Use a single oval ferrite
(TDK ZCAT2035-0930) and a single block ferrite (Fair Rite 0443164151)
for each pair of cables (BAT1/RET1 [A] and BAT2/RET2[B]).
Oval and block ferrites
Required
Onsite
None
Figure
17-18. The block ferrite should be within 5 to 6 inches (127 to 152 mm) of
Attaching Block and Oval Ferrites to Power Cabling
DLP-A30 Install Ferrites to Power Cabling
Cisco ONS 15454 Procedure Guide, R5.0
17-37

Advertisement

Table of Contents
loading

Table of Contents