Ntp- A124 Provision A Point-To-Point Network - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

NTP-A173 Point-to-Point Network Acceptance Test
Verify that the working and protect cards in the 1+1 protection groups correspond to the physical fiber
Step 4
connections between the nodes, that is, verify that the working card in one node connects to the working
card in the other node, and that the protect card in one node connects to the protect card in the other node.
Complete the
Step 5
OC-N port on both point-to-point nodes. Alternatively, if additional bandwidth is needed for CTC
management, complete the
Note
Note
Step 6
Complete the
in-service.
Step 7
As needed, complete the
As needed, complete the
Step 8
As needed, complete the
Step 9
Verify that timing is set up at both point-to-point nodes. If not, complete the
Step 10
procedure on page 4-9
card the timing source. The system will automatically choose the corresponding protect OC-N card as
the protect timing source. This will be visible in the Maintenance > Timing tab.
Step 11
Complete the
Stop. You have completed this procedure.
NTP-A173 Point-to-Point Network Acceptance Test
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
This procedure might be service affecting if performed on a node carrying traffic.
Caution
Complete the
Step 1
(default) view appears. If you are already logged in, continue with Step 2.
From the View menu, choose Go to Network View.
Step 2
Cisco ONS 15454 Procedure Guide, R5.0
5-4
"DLP-A377 Provision Section DCC Terminations" task on page 20-61
"DLP-A378 Provision Line DCC Terminations" task on page
DCC terminations are not provisioned on the protect ports.
If the point-to-point nodes are not connected to a LAN, you will need to create the DCC
terminations using a direct (craft) connection to the node. Remote provisioning is possible only
after all nodes in the network have DCC terminations provisioned to in-service OC-N ports.
"DLP-A214 Change the Service State for a Port" task on page 19-9
"DLP-A380 Provision a Proxy Tunnel" task on page
"DLP-A381 Provision a Firewall Tunnel" task on page
"DLP-A367 Create a Provisionable Patchcord" task on page
for one or both of the nodes. If a node uses line timing, make its working OC-N
"NTP-A173 Point-to-Point Network Acceptance Test" procedure on page
This procedure tests a point-to-point network.
Test set/cables appropriate to the test circuit you will create
NTP-A124 Provision a Point-to-Point Network, page 5-3
As needed
Onsite
Provisioning and higher
"DLP-A60 Log into CTC" task on page 17-66
Chapter 5
for the working
to put the protect card
20-63.
20-64.
"NTP-A28 Set Up Timing"
at one of the point-to-point nodes. The node
Turn Up Network
20-62.
20-51.
5-4.
December 2004