Dlp- A37 Install The Xcvt Or Xc10G Cards - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Chapter 17
DLPs A1 to A99
Note
Note
Verify that the ACT/STBY LED is amber for standby.
Step 9
Return to your originating procedure (NTP).
Step 10
DLP-A37 Install the XCVT or XC10G Cards
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Note
Do not use this procedure to upgrade cross-connect cards. If you are upgrading an XCVT card to an
XC10G, see
Note
When installing cards, let each card boot completely before installing the next card.
Open the latches/ejectors of the first XCVT or XC10G card that you will install.
Step 1
Use the latches/ejectors to firmly slide the card along the guide rails until the card plugs into the
Step 2
receptacle at the back of the slot (Slot 8 or 10).
Verify that the card is inserted correctly and close the latches/ejectors on the card.
Step 3
Note
Verify the LED activity:
Step 4
March 2005
If you insert a card into a slot provisioned for a different card, all LEDs turn off.
Alarm LEDs might be on; disregard alarm LEDs until you are logged into CTC and can view the
Alarms tab.
This task installs the cross-connect (XCVT/XC10G) cards.
XCVT/XC10G (cross-connect) cards
DLP-A36 Install the TCC2/TCC2P Cards, page 17-42
Required in non-DWDM shelves.
Onsite
None
Chapter 12, "Upgrade Cards and Spans."
It is possible to close the latches/ejectors when the card is not completely plugged into the
backplane. Ensure that you cannot insert the card any further.
The red LED turns on for 20 to 30 seconds.
The red LED blinks for 35 to 45 seconds.
The red LED turns on for 5 to 10 seconds.
All LEDs blink once and turn on.
The ACT/STBY LED turns on.
DLP-A37 Install the XCVT or XC10G Cards
Cisco ONS 15454 Procedure Guide, R5.0
17-45

Advertisement

Table of Contents
loading

Table of Contents