Ntp- A179 Provision An Integrated Blsr Dual-Ring Interconnect - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Chapter 5
Turn Up Network
NTP-A179 Provision an Integrated BLSR Dual-Ring Interconnect
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
are already logged in, continue with Step 2.
Complete the following steps if you have not provisioned the BLSRs that you will interconnect in a
Step 2
BLSR DRI. If the BLSRs are created, go to Step 3.
a.
b.
c.
d.
Verify that the BLSR DRI node has OC-N cards installed and has fiber connections to the other
Step 3
interconnect node:
December 2004
This procedure provisions BLSRs in an integrated DRI topology.
None
NTP-A35 Verify Node Turn-Up, page 5-2
As needed
Onsite
Provisioning and higher
"DLP-A60 Log into CTC" task on page 17-66
Complete the
"NTP-A40 Provision BLSR Nodes" procedure on page 5-10
Complete the
"NTP-A126 Create a BLSR" procedure on page 5-12
Complete the
"NTP-A175 Two-Fiber BLSR Acceptance Test" procedure on page 5-13
two-fiber BLSRs.
Complete the
"NTP-A176 Four-Fiber BLSR Acceptance Test" procedure on page 5-15
four-fiber BLSRs.
The OC-N cards that will connect the BLSRs must be installed at the two interconnect nodes.
The two interconnect nodes must have the correct fiber connections.
of an integrated two-fiber BLSR DRI configuration.
NTP-A179 Provision an Integrated BLSR Dual-Ring Interconnect
at a node in the BLSR DRI network. If you
to create the BLSRs.
Figure 5-5
Cisco ONS 15454 Procedure Guide, R5.0
to provision the BLSRs.
to test
to test
shows an example
5-19

Advertisement

Table of Contents
loading

Table of Contents