NTP-A309 Convert a 1+1 Point-to-Point to a Linear ADM Automatically
9.
10.
NTP-A309 Convert a 1+1 Point-to-Point to a Linear ADM
Automatically
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
OC-N transmit and receive levels should be in their acceptable range as shown in the specifications for
Note
each card in the
If overhead circuits exist on the network, this procedure is service affecting. The overhead circuits will
Note
drop traffic and have a status of PARTIAL after the upgrade is complete.
Complete the
Step 1
you are already logged in, continue with Step 2.
In network view, right-click the span between the two nodes where you want to add the new node. A
Step 2
dialog box appears.
Select Upgrade Protection. A drop-down list appears.
Step 3
Select Terminal to Linear and the first page of the Upgrade Protection: Terminal to Linear wizard
Step 4
appears.
The first page of the wizard lists the following conditions for adding a new node:
Step 5
Cisco ONS 15454 Procedure Guide, R5.0
13-2
NTP-A211 Convert a Two-Fiber BLSR to a Four-Fiber BLSR Automatically, page
13-17—Complete as needed.
NTP-A159 Modify a BLSR, page
This procedure converts a 1+1 point-to-point (terminal) configuration
(two nodes) to a 1+1 linear add-drop multiplexer (ADM) (3 nodes)
without losing traffic.
Compatible hardware necessary for the upgrade (for example, XC10G,
XCVT, or XC10G cards and OC-48 any slot [AS] cards)
Attenuators might be needed for some applications.
This procedure requires that the node to be added is reachable (has IP
connectivity with CTC). Two technicians who can communicate with
each other during the upgrade might be needed if the PC running CTC
and the ONS 15454s are not at the same location.
As needed
Onsite
Provisioning or higher
Table 2-3 on page
"DLP-A60 Log into CTC" task on page 17-66
13-18—Complete as needed.
2-15.
at one of the two point-to-point nodes. If
Chapter 13
Convert Network Configurations
December 2004

Advertisement

Table of Contents
loading

Table of Contents