Cisco ONS 15454 Series Procedure Manual page 336

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

NTP-A303 Convert an Unprotected Point-to-Point or 1+1 Linear ADM to a Two-Fiber BLSR Automatically
Complete the
Step 8
OC-N cards in the new node that will connect to the linear ADM network. Alternatively, if additional
bandwidth is needed for CTC management, complete the
task on page
Note
Step 9
In node view, display the point-to-point node that will connect to the new node.
Complete the
Step 10
point-to-point node has OC-N cards installed that can connect to the new node.
Create a 1+1 protection group for the OC-N cards that will connect to the new node. See the
Step 11
Create a 1+1 Protection Group" task on page 17-81
Create DCC terminations on the working OC-N card that will connect to the new node. See the
Step 12
"DLP-A377 Provision Section DCC Terminations" task on page
Step 13
From the View menu, choose Go to Node View to open the new node in node view.
Complete the
Step 14
using line timing, make the working OC-N card the timing source.
From the View menu, choose Go to Network View. Verify that the newly created linear ADM
Step 15
configuration is correct. One green span line should appear between each linear node.
Click the Alarms tab.
Step 16
a.
b.
Repeat the procedure to add an additional node to the linear ADM.
Step 17
Stop. You have completed this procedure.
NTP-A303 Convert an Unprotected Point-to-Point or 1+1 Linear
ADM to a Two-Fiber BLSR Automatically
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Cisco ONS 15454 Procedure Guide, R5.0
13-6
"DLP-A377 Provision Section DCC Terminations" task on page 20-61
20-62.
DCC failure alarms appear until you create DCC terminations in the point-to-point node during
Step
9.
"NTP-A24 Verify Card Installation" procedure on page 4-2
"NTP-A28 Set Up Timing" procedure on page 4-9
Verify that the alarm filter is not on. See the
page 19-17
as necessary.
Verify that no unexplained alarms appear on the network. If alarms appear, investigate and resolve
them before continuing. Refer to the Cisco ONS 15454 Troubleshooting Guide for procedures.
This procedure converts an unprotected point-to-point (two nodes) or
linear ADM (three or more nodes) to a two-fiber bidirectional line
switched ring (BLSR) without disrupting traffic.
None
NTP-A44 Provision Path Protection Nodes, page 5-20
As needed
Onsite or remote
Provisioning or higher
Chapter 13
"DLP-A378 Provision Line DCC Terminations"
to ensure that the
for instructions.
20-61.
for the new node. If the new node is
"DLP-A227 Disable Alarm Filtering" task on
Convert Network Configurations
for the working
"DLP-A73
December 2004

Advertisement

Table of Contents
loading

Table of Contents