Ntp- A177 Path Protection Acceptance Test - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Chapter 5
Turn Up Network
DS-3—If you are testing a clear channel DS-3, you must have a DSX-3 panel or a direct DS-3
interface into the ONS 15454. Set the test set for clear channel DS-3. For information about
configuring your test set, consult your test set user guide.
DS3XM-6—If you are testing a DS-1 circuit on a DS3XM-6 card you must have a DSX-3 panel or
a direct DS-3 interface to the ONS 15454. Set the test set for a multiplexed DS-3, then choose the
DS-1 to test on the multiplexed DS-3. For information about configuring your test set, consult your
test set user guide.
OC-N—If you are testing an OC-N circuit, set the test set for the applicable circuit size. For
information about configuring your test set, consult your test set user guide.
Verify the integrity of all patch cables that will be used in this test by connecting one end to the test set
Step 8
Tx connector and the other end to the test set Rx connector. If the test set does not run error-free, check
the cable for damage and check the test set to make sure it is set up correctly before continuing.
Create a physical loopback at the circuit destination card:
Step 9
Attach one end of a patch cable to the destination port's Tx connector.
a.
Attach the other end to the port's Rx connector.
b.
Step 10
At the circuit source card:
Connect the Tx connector of the test set to the circuit Rx connector.
a.
Connect the test set Rx connector to the circuit Tx connector.
b.
Verify that the test set has a clean signal. If a clean signal does not appear, repeat Steps
Step 11
make sure the test set and cabling are configured correctly.
Inject BIT errors from the test set. To verify that you have a complete end-to-end circuit, verify that the
Step 12
errors appear at the test set.
Complete the
Step 13
Complete the
Step 14
From the View menu, choose Go to Network View.
Step 15
Click one of the two spans leaving the circuit source node.
Step 16
Complete the
Step 17
protection switching function on this span.
In network view, click the other circuit source span and repeat
Step 18
Set up and complete a BER test. Use the existing configuration and follow your site requirements for the
Step 19
length of time. Record the test results and configuration.
Complete the
Step 20
Step 21
Remove any loopbacks, switches, or test sets from the nodes after all testing is complete.
Step 22
Click the Alarms tab.
Verify that the alarm filter is not on. See the
a.
page 19-17
Verify that no unexplained alarms appear on the network. If unexplained alarms appear, resolve
b.
them before continuing. Refer to the Cisco ONS 15454 Troubleshooting Guide if necessary.
c.
Complete the
Click the Conditions tab.
Step 23
Verify that no unexplained conditions appear on the network. If unexplained conditions appear,
a.
resolve them before continuing. Refer to the Cisco ONS 15454 Troubleshooting Guide if necessary.
December 2004
"DLP-A356 TCC2/TCC2P Card Active/Standby Switch Test" task on page
"DLP-A255 Cross-Connect Card Side Switch Test" task on page
"DLP-A94 Path Protection Switching Test" task on page 17-95
"DLP-A333 Delete Circuits" task on page 20-21
as necessary.
"DLP-A516 Export CTC Data" task on page 22-6
NTP-A177 Path Protection Acceptance Test
Step
17.
for the test circuit.
"DLP-A227 Disable Alarm Filtering" task on
to export the alarm information.
Cisco ONS 15454 Procedure Guide, R5.0
6
through
10
to
20-40.
19-37.
to test the path protection
5-23

Advertisement

Table of Contents
loading

Table of Contents