NTP-A135 Test Electrical Circuits
Verify that the VAP you just created appears in the circuits list. VAPs are identified in the Type column.
Step 18
The VAP tunnel automatically transitions into the IS-NR service state.
Stop. You have completed this procedure.
NTP-A135 Test Electrical Circuits
Purpose
Tools/Equipment
Prerequisite Procedures This procedure assumes you completed a facility loopback tests on the
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
electrical circuits. If you are already logged in, continue with
From the View menu, choose Go to Network View.
Step 2
Click the Circuits tab.
Step 3
Step 4
Complete the
circuit ports to the maintenance service state (OOS-MA,MT). Take note of the original state because you
will return the circuit to that state later.
Set the source and destination DS1 or DS3 card line length:
Step 5
a.
b.
c.
d.
Cisco ONS 15454 Procedure Guide, R5.0
6-36
This procedures tests DS-1 and DS-3 circuits.
A test set and all appropriate cables
fibers and cables from the source and destination ONS 15454s to the digital
signal cross-connect (DSX), and that you created a circuit using one of the
following procedures:
NTP-A139 Create a Half Circuit on a BLSR or 1+1 Node, page 6-52
NTP-A140 Create a Half Circuit on a Path Protection Node, page 6-54
NTP-A181 Create an Automatically Routed DS-1 Circuit, page 6-6
NTP-A182 Create a Manually Routed DS-1 Circuit, page 6-11
NTP-A183 Create a Unidirectional DS-1 Circuit with Multiple Drops,
page 6-14
NTP-A184 Create an Automatically Routed DS-3 Circuit, page 6-18
NTP-A185 Create a Manually Routed DS-3 Circuit, page 6-23
NTP-A186 Create a Unidirectional DS-3 Circuit with Multiple Drops,
page 6-25
Required
Onsite
Provisioning or higher
"DLP-A60 Log into CTC" task on page 17-66
"DLP-A230 Change a Circuit Service State" task on page 19-19
In network view, double-click the source node.
Double-click the circuit source card and click the Provisioning > Line tabs.
From the circuit source port Line Length drop-down list, choose the line length for the distance (in
feet) between the DSX (if used) or circuit termination point and the source ONS 15454.
Click Apply.
Chapter 6
Create Circuits and VT Tunnels
at the node where you want to test the
Step
2.
to set the circuit and
August 2005