Ntp- A261 Set Power Monitor Thresholds - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

NTP-A261 Set Power Monitor Thresholds
Click Apply.
Step 4
In the confirmation dialog box, click Yes.
Step 5
Review the node information. If you need to make corrections, repeat Steps
Step 6
corrections. If the information is correct, continue with the
procedure on page
Stop. You have completed this procedure.
NTP-A261 Set Power Monitor Thresholds
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
already logged in, continue with Step 2.
In node view, click the Provisioning > General > Power Monitor tabs.
Step 2
To change the extreme low battery voltage threshold in 0.5 VDC increments, choose a voltage from the
Step 3
ELWBATVGVdc drop-down list.
To change the low battery voltage threshold in 0.5 VDC increments, choose a voltage from the
Step 4
LWBATVGVdc drop-down list.
To change the high battery voltage threshold in 0.5 VDC increments, choose a voltage from the
Step 5
HIBATVGVdc drop-down list.
Cisco ONS 15454 Procedure Guide, R5.0
4-6
Time Zone—Click the field and choose a city within your time zone from the drop-down list. The
menu displays the 80 World Time Zones from –11 through 0 (GMT) to +14. Continental United
States time zones are GMT-05:00 (Eastern), GMT-06:00 (Central), GMT-07:00 (Mountain), and
GMT-08:00 (Pacific).
Use Daylight Savings Time—Check this check box if the time zone that you chose is using Daylight
Savings Time.
Insert AIS-V on STS-1 SD-P—Check this check box if you want Alarm Indication Signal Virtual
Tributary (AIS-V) conditions inserted on VT circuits carried by STS-1s when the STS-1 crosses its
Signal Degrade Path (SD-P) bit error rate (BER) threshold. On protected circuits, traffic will be
switched. If the switch cannot be performed, or if circuits are not protected, traffic will be dropped
when the STS-1 SD-P BER threshold is reached.
SD-P BER—If you selected Insert AIS-V, you can choose the SD-P BER level from the SD-P BER
drop-down list.
4-6.
This procedure provisions extreme high, high, extreme low, and low input
battery power thresholds within a –48 volts direct current (VDC)
environment. When the thresholds are crossed, the TCC2/TCC2P
generates warning alarms in CTC.
None
NTP-A24 Verify Card Installation, page 4-2
Required
Onsite or remote
Provisioning or higher
"DLP-A60 Log into CTC" task on page 17-66
Chapter 4
3
through
"NTP-A261 Set Power Monitor Thresholds"
for the node you will set up. If you are
Turn Up Node
5
to enter the
December 2004

Advertisement

Table of Contents
loading

Table of Contents