NTP-A12 Install Ferrites
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
Complete the
Step 2
Continue with the
Step 3
Stop. You have completed this procedure.
March 2005
Installing the Rear Cover with Standoffs
This procedure describes how to attach ferrites.
Oval and block ferrites
NTP-A6 Install the Power and Ground, page 1-9
NTP-A8 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections,
page 1-15
Required
Onsite
None
"DLP-A30 Install Ferrites to Power Cabling" task on page 17-37
"DLP-A31 Attach Ferrites to Wire-Wrap Pin Fields" task on page 17-38
"NTP-A13 Perform the Shelf Installation Acceptance Test" procedure on page
NTP-A12 Install Ferrites
as needed.
Cisco ONS 15454 Procedure Guide, R5.0
as needed.
1-30.
1-29