Dlp- A367 Create A Provisionable Patchcord - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Chapter 20
DLPs A300 to A399
A user-initiated switch overrides the revertive delay, that is, when you clear a switch you clear the timer
Note
and traffic reverts immediately.
In node view, click the Maintenance > Protection tabs.
Step 1
In the Protection Groups area, select the protection group you want to switch.
Step 2
In the Selected Group area, select the card you want to switch.
Step 3
Step 4
Click Switch.
Step 5
In the confirmation dialog box, click Yes.
Return to your originating procedure (NTP).
Step 6
DLP-A367 Create a Provisionable Patchcord
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Note
To set up a provisionable patchcord between an optical port and a transponder/muxponder, optical
add/drop multiplexer, or multiplexer/demultiplexer port, the optical port must have an SDCC/LDCC
termination provisioned. If the port is the protection port in a 1+1 group, the working port must have an
SDCC/LDCC termination provisioned. As needed, complete the
Terminations" task on page 20-61
page
An optical port requires two patchcords when the remote end is Y-cable protected or is an optical
Note
add/drop multiplexer or multiplexer/demultiplexer port.
In node view, click the Provisioning > Comm Channels > Provisionable Patchcords tabs. If you are
Step 1
in network view, click the Provisioning > Provisionable Patchcords tabs.
Click Create. The Provisionable Patchcord dialog box appears.
Step 2
March 2005
This task creates a provisionable patchcord. Provisionable patchcords
appear as dashed lines in CTC network view.
For the specific situations in which a patchcord is necessary, refer to the
Cisco ONS 15454 Reference Manual.
OC-N, transponder/muxponder, optical add/drop multiplexer, and
multiplexer/demultiplexer cards.
For the card combinations that support patchcords, refer to the
Cisco ONS 15454 Reference Manual.
DLP-A60 Log into CTC, page 17-66
As needed
Onsite or remote
Provisioning or higher
20-62.
or
"DLP-A378 Provision Line DCC Terminations" task on
Cisco ONS 15454 Procedure Guide, R5.0
DLP-A367 Create a Provisionable Patchcord
"DLP-A377 Provision Section DCC
20-51

Advertisement

Table of Contents
loading

Table of Contents