Dlp- A32 Inspect The Shelf Installation And Connections - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Chapter 17
DLPs A1 to A99
DLP-A32 Inspect the Shelf Installation and Connections
Purpose
Tools/Equipment
Prerequisite Procedures Complete
Required/As Needed
Onsite/Remote
Security Level
Check each wire and cable connection to make sure all cables are locked securely. If a wire or cable is
Step 1
loose, return to the applicable installation procedure to correct it.
To check that the backplane is seated correctly, verify that the screw holes and the backplane interface
Step 2
card holes align properly and that the A and B connectors interlock.
Return to your originating procedure (NTP).
Step 3
DLP-A33 Measure Voltage
Purpose
Tools/Equipment
Prerequisite Procedures Complete
Required/As Needed
Onsite/Remote
Security Level
Using a voltmeter, verify the office ground and power.
Step 1
terminals.
a.
b.
Step 2
Using a voltmeter, verify the shelf ground and power wiring:
a.
b.
March 2005
Use this task to inspect the shelf installation and connections and to verify
that everything is installed and connected properly.
None
Required
Onsite
None
This task measures the power in order to verify correct power and returns.
Voltmeter
Required
Onsite
None
Place the black lead (positive) on the frame ground on the bay. Hold it there while completing Step
Place the red lead (negative) on the fuse power points and alarm panel to verify that they read
between –40.5 VDC and –57 VDC (power) or 0 (return ground).
Place the black lead (positive) on the RET1 point and the red lead on the BAT1 point. Verify a
reading between –40.5 VDC and –57 VDC. If there is no voltage, check the following and correct
if necessary:
Battery and ground are reversed to the shelf.
Battery is open or missing.
Return is open or missing.
Repeat
Step 2
for the RET2 and BAT2 if the B power feed is provided.
DLP-A32 Inspect the Shelf Installation and Connections
Table 1-5 on page 1-30
Table 1-5 on page
1-30.
Figure 17-10 on page 17-20
Cisco ONS 15454 Procedure Guide, R5.0
shows the power
b.
17-39

Advertisement

Table of Contents
loading

Table of Contents