Figure 20-23 Installed Alignment Standoffs - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Chapter 20
DLPs A300 to A399
DLP-A399 Install a UBIC-H EIA
Figure 20-23
Installed Alignment Standoffs
Installed alignment standoffs
Line up the alignment pins on the UBIC-H EIA
(Figure
20-24) with the alignment standoffs on the
Step 6
shelf and push the UBIC-H EIA with consistent pressure until the pins and standoffs fit together firmly.
Cisco ONS 15454 Procedure Guide, R5.0
20-98
March 2005

Advertisement

Table of Contents
loading

Table of Contents