NTP-A314 Create a Unidirectional OC-N Circuit with Multiple Drops
Figure 6-12
Complete the
Step 17
Click Finish. If the path does not meet the specified path diversity requirement, CTC displays an error
Step 18
message and allows you to change the circuit path. If you entered more than 1 in the Number of Circuits
field, the Circuit Creation dialog box appears after the circuit is created so you can create the remaining
circuits. Repeat Steps
When all the circuits are created, the main Circuits window appears. Verify that the circuits you created
Step 19
appear in the window.
Complete the
Step 20
Stop. You have completed this procedure.
NTP-A314 Create a Unidirectional OC-N Circuit with Multiple
Drops
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
circuit. If you are already logged in, continue with
If you want to assign a name to the tunnel source and destination ports before you create the circuit,
Step 2
complete the
From the View menu, choose Go to Network View.
Step 3
Click the Circuits tab, then click Create.
Step 4
Step 5
In the Circuit Creation dialog box, complete the following fields:
Cisco ONS 15454 Procedure Guide, R5.0
6-46
Selecting BLSR DRI Primary and Secondary Node Assignments (Manual Routing)
"DLP-A369 Provision an OC-N Circuit Route" task on page
5
through
"NTP-A62 Test OC-N Circuits" procedure on page
This procedure creates a unidirectional OC-N circuit with multiple traffic
drops (circuit destinations).
None
NTP-A127 Verify Network Turn Up, page 6-4
As needed
Onsite or remote
Provisioning or higher
"DLP-A60 Log into CTC" task on page 17-66
"DLP-A314 Assign a Name to a Port" task on page
Circuit Type—Choose STS.
Number of Circuits—Leave the default unchanged (1).
17
for each additional circuit.
Step
2.
Chapter 6
Create Circuits and VT Tunnels
20-53.
6-51.
on the node where you will create the
20-8. If not, continue with
Step