Cisco ONS 15454 Series Procedure Manual page 35

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

DLP-A1 Unpack and Verify the Shelf Assembly
DLP-A2 Inspect the Shelf Assembly
DLP-A3 Reverse the Mounting Bracket to Fit a 19-inch (482.6 mm) Rack
DLP-A4 Install the External Brackets and Air Filter
DLP-A5 Mount the Shelf Assembly in a Rack (One Person)
DLP-A6 Mount the Shelf Assembly in a Rack (Two People)
DLP-A7 Mount Multiple Shelf Assemblies in a Rack
DLP-A8 Open the Front Door
DLP-A9 Remove the Front Door
DLP-A10 Remove the Lower Backplane Cover
DLP-A11 Remove the Backplane Sheet Metal Cover
DLP-A12 Install a BNC or High-Density BNC EIA
DLP-A13 Install an SMB EIA
DLP-A14 Install the AMP Champ EIA
DLP-A16 Connect the Office Ground to the ONS 15454
DLP-A17 Connect Office Power to the ONS 15454 Shelf
DLP-A18 Turn On and Verify Office Power
DLP-A19 Install Alarm Wires on the Backplane
DLP-A20 Install Timing Wires on the Backplane
DLP-A21 Install LAN Wires on the Backplane
DLP-A22 Install the TL1 Craft Interface
DLP-A23 Install DS-1 Cables Using Electrical Interface Adapters (Balun)
DLP-A24 Install DS-1 AMP Champ Cables on the AMP Champ EIA
DLP-A25 Install Coaxial Cable With BNC Connectors
DLP-A26 Install Coaxial Cable With High-Density BNC Connectors
DLP-A27 Install Coaxial Cable with SMB Connectors
DLP-A28 Route Coaxial Cables
DLP-A29 Route DS-1 and DS-3/EC-1 Twisted-Pair Cables
DLP-A30 Install Ferrites to Power Cabling
DLP-A31 Attach Ferrites to Wire-Wrap Pin Fields
DLP-A32 Inspect the Shelf Installation and Connections
December 2004
17-1
17-2
17-4
17-7
17-8
17-9
17-10
17-11
17-12
17-15
17-16
17-18
17-19
17-21
17-22
17-25
17-26
17-27
17-32
17-33
17-35
17-37
17-38
17-39
17-2
17-5
17-6
17-28
17-29
17-33
17-36
Cisco ONS 15454 Procedure Guide, R5.0
T A S K S
xxxv

Advertisement

Table of Contents
loading

Table of Contents