NEC Univerge sv8500 Manual page 607

Fp85-110 s7
Hide thumbs Also See for Univerge sv8500:
Table of Contents

Advertisement

7.3.6
Basic Test Procedures
[1] Basic Connection Test
START
1. Is the PWR Lamp lighting green?
NO
Is the Power Cable firmly connected?
YES
2. Is the LINK Lamp lighting green?
NO
The MCMG may not be physically connected to the LAN. Check the LAN Cable between the MCMG
and Network Device.
Use a LAN Cable (straight-through).
YES
Test the continuity in the LAN Cable.
Make sure the network device (SW HUB or Router) is turned ON.
If the problem is not cleared, change the LAN Cable or change the network device.
*Initial setting on MCMG is started.
*Registration established.
*Initial setting between MCMG and MGC (Telephony Server) is started.
*MCMG starts operating normally.
3. Is the ON LINE Lamp lights green?
NO
Confirm the data setting of MGC (Telephony Server) and MCMG.
MGC: Confirm the data setting of ASYD, ASYDL, ALOCL, ADTM, ALIDL, ARTD, ARTI, ATRK, AMGIL,
and AMGVL.
YES
MGC: Confirm the data setting of ALIDL and AISTL.
MCMG Card: Check configuration data assigned by maintenance console.
A
MCMG [SCA-4LC2COTA/MG-4LC2COTA]
VOL.2-354

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents