NEC Univerge sv8500 Manual page 508

Fp85-110 s7
Hide thumbs Also See for Univerge sv8500:
Table of Contents

Advertisement

6.3.6
Basic Test Procedures
Basic Connection Test
START
1. Is the PWR Lamp lighting green?
NO
Is the Power Cable firmly connected?
YES
2. Is the LINK/TxRx Lamp lighting green?
NO
The MC&MG may not be physically connected to the LAN. Check the LAN Cable between the MC&MG
and Network Device.
Use a LAN Cable (straight-through).
YES
Test the continuity in the LAN Cable.
Make sure the network device (SW HUB or Router) is turned ON.
If the problem is not cleared, change the LAN Cable or change the network device.
*Initial setting on MC&MG is started.
*Registration established.
*Initial setting between MC&MG and MGC is started.
*MC&MG starts operating normally.
3. Is the ON LINE Lamp lights green?
NO
Confirm the data setting of MGC and MC&MG.
MGC: Confirm the data setting of ASYD, ASYDL, ALOCL, ADTM, ALIDL, ARTD, ARTI, ATRK, AMGIL,
and AMGVL.
YES
MGC: Confirm the data setting of ALIDL and AISTL.
MC&MG: Check configuration data assigned by maintenance console.
A
Note : "MGC" represents Telephony Server.
VOL.2-255
MC & MG with PFT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents