Connecting C.o. Lines - NEC Univerge sv8500 Manual

Fp85-110 s7
Hide thumbs Also See for Univerge sv8500:
Table of Contents

Advertisement

STEP 2: Connect C.O. Lines to MG0-MG6.
FRONT
100M LINK
100M LINK
PWR
ALM
Ether
to C.O. line
STEP 3: Check the lamp indication on the front panel of MCMG.
- PWR lamp: lights green
- ALARM lamp: OFF (*used for MCMG Card only)
- ON LINE MC lamp: OFF
- ON LINE MG lamp: OFF
- OPERATION MC lamp: flashes green
- OPERATION MG0~MG6: flashes green
After the data assignment (MCMG entry, incoming/originating outside call data) on the Telephony Server
Note:
side has been completed, the corresponding ON LINE MC/MG lamp lights green and OPERATION MC/
MG lamp will go out.

Connecting C.O. Lines

MC
MG1
MG3
MG5
MG0
MG2
MG4
MG6
ON
MC MG1 MG3 MG5
LINE
MC MG
MG0 MG2 MG4 MG6
OPERATION
VOL.2-455
MG0-MG6 connector
PFTRD
CONSOLE
RESET
MUSIC
MG7MC1
MCMG Card [SCA-7COTA]
RJ-11connector
pin assignment
2 1
B A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents