SSANGYONG 2004 Rexton 2.7XDi Workshop Manual page 1001

Table of Contents

Advertisement

Assembly
Clean the components and replace if damaged.
1. Align the alignment marks on the yoke and assemble
the spider, bearing and snap ring.
2. Apply the grease to the inner lip of needle roller bearing
and assemble the needle roller.
3. Install the yoke bearing shaft on the shaft and insert the
spider. Place the cap on the opposite side and tap it
with plastic hammer to seat it. Adjust the clearance of
spider below 0.1 mm and install the snap ring.
4. Install the intermediate bearing to the rear propeller shaft.
5. Apply the grease on the propeller shaft and install it.
PROPELLER SHAFT
REXTON SM - 2004.4
Flange yoke
Spider
Bearing
Snap ring
Yoke
Needle roller bearing
Grease
CHANGED BY
EFFECTIVE DATE
AFFECTED VIN
4C-13
Y220_04C022
Y220_04C023
Y220_04C024
Y220_04C026

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents