High And Low Pressure Lines - Removal And Installation - SSANGYONG 2004 Rexton 2.7XDi Workshop Manual

Table of Contents

Advertisement

10C-30
CHANGED BY
EFFECTIVE DATE
AFFECTED VIN
High and Low Pressure Lines -
Removal and Installation
1. Discharge and recover the refrigerant from the air
conditioner system.
Y220_10C050
2. Unscrew the flange nuts and remove the high and low
pressure pipes.
Y220_10C051
3. Remove the high and low pressure pipes from the
evaporator.
Y220_10C052
Notice
Never reuse the O-ring and washer once removed.
4. Install in the reverse order of removal.
5. Evacuate and recharge the air conditioner system.
A/C SYSTEM
REXTON SM - 2004.4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents