Hydraulic Circuit After Completed Gear Change - SSANGYONG 2004 Rexton 2.7XDi Workshop Manual

Table of Contents

Advertisement

3A1-72

Hydraulic Circuit After Completed Gear Change

14. 1-2/4-5 command valve
15. 1-2/4-5 holding pressure shift valve
16. 1-2 /4-5 shift valve
18. 1-2/4-5 pressure overlap control valve
The 1-2/4-5 shift solenoid valve interrupts the pressure on the end face of the command valve (14) and it returns to its
base position. The operating pressure (p-A) is now applied to clutch C1 via the holding pressure shift valve (15) and the
command valve (14). The brake B1 is disengaged (unpressurized). The spring of the shift pressure shift valve (16) moves
it into base position.
CHANGED BY
EFFECTIVE DATE
AFFECTED VIN
1-2/4-5 shift solenoid valve
0. Return flow to oil sump
p-A. Operating pressure
p-MOD. Modulating pressure
p-S. Shift pressure
p-SV. Shift valve pressure
DC 5-SPEED AUTOMATIC TRANSMISSION
Y220_3A1080
REXTON SM - 2004.4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents