3B-50
Groove
CHANGED BY
EFFECTIVE DATE
AFFECTED VIN
Reassembly
1. Install the 2nd gear needle bearing.
Notice
The 1st/2nd/3rd gear needle bearings have one
bearing row and the sizes of them are same. The
reverse needle bearing has two bearing rows. The
5th needle bearing is smaller than others and consists
of two bearings.
Y220_03B107
2. Install the 2nd gear and synchronizer outer ring,
intermediate cone and inner ring in regular sequence.
Y220_03B108
3. Insert three keys into 1/2 synchronizer hub and double
synchronizer sleeve. Install the synchronizer spring in
offset so that it should not be missed out.
Notice
1/2 gear double synchronizer sleeve doesn't have a
step at edge, however, 3/4 and 5/R gears have it.
No step
Y220_03B109
TSM54/52 MANUAL TRANSMISSION
REXTON SM - 2004.4