Gear Shift Control Lever - SSANGYONG 2004 Rexton 2.7XDi Workshop Manual

Table of Contents

Advertisement

3A2-204
CHANGED BY
EFFECTIVE DATE
AFFECTED VIN

GEAR SHIFT CONTROL LEVER

Disassembly and Assembly
Procedure
1. Disconnect the negative battery cable.
2. Remove the gear shift control lever assembly. Refer to
Section Interior Trim.
3. Remove the gear shift control lever knob.
4. Separate the upper and middle housing from the gear
shift control lever assembly by unlocking the lock.
5. Remove the upper housing.
Y220_3A25P0
6. Disconnect the P position lamp by turning it from the
middle housing.
7. Remove the P position switches assembly bolts.
8. Remove the middle housing with the mode selector switch
wiring harness from the gear shift control lever assembly.
9. Separate the P position switches assembly with the P
position lamp wiring harness from the gear shift control
lever assembly.
Notice
Adjust the brake transmission shift interlock ease the
operation well.
Y220_3A25Q0
10. Remove the clips supporting the springs and bushes from
the pin of the pin of the gear shift control lever.
11. Remover the spring and bushes from the pin of the gear
shift control lever.
12. Remove the gear shift control lever by pushing the pin.
13. Installation should follow the removal procedure in the
reverse order.
Y220_3A25R0
BTRA 4 AUTO TRANSMISSION
REXTON SM - 2004.4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents