SSANGYONG 2004 Rexton 2.7XDi Workshop Manual page 738

Table of Contents

Advertisement

4. Check the clutch pack clearance using 0555-336260
clutch pack clearance kit.
5. Use selective plates to achieve the correct specifi-cation.
Notice
With the clutch pack supporting a 2 kg weight, the
dimension from the input shaft locating stop to the
friction disc must be 0.70 ~ 0.90 mm.
6. If new friction plates are being fitted, remove the clutch
pack and soak the friction elements in auto-matic
transmission fluid for a minimum of five minutes prior to
assembly.
Notice
The clutch pack clearance must be taken before
elements are soaked in automatic transmission fluid.
7. Check the fit of the C1 clutch hub on the overdrive shaft.
If it is loose, the hub and shaft assembly must be
replaced.
8. Coat the small nylon thrust spacer with petroleum jelly
and install it over the overdrive shaft.
9. Carefully fit the overdrive shaft into the C1 cylinder so as
not to damage the sealing ring.
10. Fit the small bronze C1 hub thrust washer in place with
petroleum jelly.
11. Check the input shaft for any defect. Fit the input shaft
into the cylinder and secure it with the circlip, ensuring
that the circlip is completely seated in the groove.
12. Coat the sealing rings with petroleum jelly and fit onto
the input shaft.
BTRA 4 AUTO TRANSMISSION
REXTON SM - 2004.4
3A2-189
Y220_3A20Z0
Y220_3A2660
Y220_3A21A0
CHANGED BY
EFFECTIVE DATE
AFFECTED VIN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents