Agilent Technologies E5071C Manual page 133

Hide thumbs Also See for E5071C:
Table of Contents

Advertisement

E5071C
4. Select the test ports (and corresponding S parameters) upon which a
THRU response calibration is to be performed.
5. Make a between the selected test ports (between the connectors to
which the DUT will be connected).
6. Click Thru to start the calibration measurement.
The sweep is performed twice in the one thru
o
measurement.
7. If an isolation calibration must be performed using a LOAD standard,
follow the procedure below.
6.
a. Connect a LOAD standard to each of the two selected test ports
(connectors to which the DUT is to be connected).
132

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents