Checklist: Installing The Auxiliary Hoist - Manitowoc Grove GMK4100L-1 Operating Manual

Hide thumbs Also See for Grove GMK4100L-1:
Table of Contents

Advertisement

Driving modes
6.4 Rigging the auxiliary hoist
6.4.2
6 - 18

CHECKLIST: Installing the auxiliary hoist

– The superstructure is slewed to the front.
– The main boom is resting in the boom rest.
1. Attach the auxiliary hoist at the centre of gravity and remove the bolts
from the connection points;
2. Lift the auxiliary hoist on to the turntable and make the connections;
à
p. 6 - 20.
3. – Make the hydraulic connections;
– Make the electrical connection;
– Establish the connection to the central lubrication;
4. – Check that the auxiliary hoist is functioning properly;
– Place the hoist rope on and reeve it.
5. – Fit the hoist rope, using the rigging aid if necessary;
– Reeve the hoist rope;
à
p. 6 - 17.
à
à
à
p. 12 - 108.
3 302 690 en
p. 6 - 21.
p. 6 - 22.
à
p. 6 - 23
à
à
Operating manual
p. 6 - 25.
p. 6 - 26.
GMK4100L-1

Advertisement

Table of Contents

Troubleshooting

loading
Need help?

Need help?

Do you have a question about the Grove GMK4100L-1 and is the answer not in the manual?

Table of Contents

Save PDF