Malfunctions during crane operation
14.7 Hydraulic emergency operation as per BGR 159
Removing
14 - 62
After the emergency operation, you must disconnect the hoses and the
transformer.
On the superstructure
•
Remove the hoses (2) from the connec-
tions (1).
•
Close off the hoses and connections with
the caps.
On the carrier
•
Remove the hoses (2) from the connec-
tions (1).
•
Close off the hoses and connections with
the caps.
•
Remove the transformer (3).
3 302 690 en