11.5 Crane operation with main boom
Lifting and
lowering
G
G
11 - 80
Check whether the current reeving of the auxiliary hoist is displayed,
for example, 6. Correct the reeving if necessary;
You can adjust the sensitivity of the control levers to suit the operating
à
Setting the characteristic curves for the control levers , p. 11 - 129.
conditions;
Risk of accidents due to gaps in monitoring
Operation of the hoist will only be monitored fully if:
– The lifting limit switch is correctly rigged;
– The lifting limit switch is not overridden;
– The lowering limit switch is correctly set;
Risk of accident by suspended loads
Never switch off the engine whilst a load is suspended. You must have the
control levers at hand in order to intervene at any time.
Always set down the load before you leave the crane cab.
Raising:
Pull the control lever to the rear – symbol (3) is displayed.
Lowering:
Pull the control lever to the front – symbol (2) is displayed.
When the hoist drum is turning, you will notice a pulse on the slewing
indicator (1).
You can regulate the speed by moving the control lever and changing the
engine speed with the accelerator.
You can switch on high-speed mode for a higher speed;
3 302 690 en
à
p. 11 - 39.
à
p. 12 - 120
à
p. 11 - 82
à
p. 11 - 82
à
p. 11 - 113.
Operating manual
GMK4100L-1

Advertisement

Table of Contents

Troubleshooting

loading
Need help?

Need help?

Do you have a question about the Grove GMK4100L-1 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF