Rigging Work; Rigging Work Checklists For Crane Operation With The Main Boom; Checklist: Rigging - Manitowoc Grove GMK4100L-1 Operating Manual

Hide thumbs Also See for Grove GMK4100L-1:
Table of Contents

Advertisement

12
12.1
H
12.1.1
H
Operating manual
GMK4100L-1

12.1 Rigging work checklists for crane operation with the main boom

Rigging work

If the truck crane on the site has already been rigged, proceed according to
the CHECKLIST: Checks before operating the crane , p. 11 - 1.
Rigging work checklists for crane operation with the
main boom
This checklist is not a complete operating manual. There are accompanying
operating instructions which are indicated by cross-references.
Observe the warnings and safety instructions there.

CHECKLIST: Rigging

1. Choose a suitable site;
2. Check that the parking brake is engaged – if necessary, engage the
parking brake.
3. If the main boom is resting on a dolly:
– Switch off the boom floating position;
– Switch off the slewing gear freewheel;
– If necessary, switch off boom pre-tensioning;
The following points only apply to rigging in Free on wheels working position.
Continue the checklist at point 8. when rigging the truck crane on outriggers.
à
Choice of a suitable positioning site , p. 12 - 11.
3 302 690 en
Rigging work
à
p. 12 - 19
à
p. 12 - 20
à
p. 12 - 21
s
12 - 1

Advertisement

Table of Contents

Troubleshooting

loading
Need help?

Need help?

Do you have a question about the Grove GMK4100L-1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF