12.1 Rigging work checklists for crane operation with the main boom
12 - 6
21. Install the camera on main boom if required;
operation , p. 12 - 132.
22. Fold out and adjust all mirrors for crane operation;
23. Perform all the required checks prior to crane operation;
à
CHECKLIST: Checks before operating the crane , p. 11 - 1.
24. Enter and confirm the current rigging mode;
p. 11 - 32.
25. With the rigging mode adjusted accordingly, rig the counterweight
combination required for the operation according to Lifting capacity
à
table ;
CHECKLIST: Rigging the counterweight , p. 12 - 76.
26. Enter the current rigging mode with the new rigged counterweight
combination at the RCL display;
à
Enter rigging mode , p. 11 - 32.
3 302 690 en
à
Cameras for crane
à
p. 12 - 130.
à
Enter rigging mode ,
Operating manual
GMK4100L-1

Advertisement

Table of Contents

Troubleshooting

loading
Need help?

Need help?

Do you have a question about the Grove GMK4100L-1 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF