Operating manual
GMK4100L-1
Switch monitoring on;
Limiting lifting
•
Lift the load to the necessary height.
Select the symbol (1).
•
Press the button (6) or (7) once.
The current numerical value (5) is set at
the symbol (2) as the upper limit value,
symbol (1) confirms the entry.
Limiting lowering
•
Lower the load to the necessary height.
Select the symbol (4).
•
Press the button (6) or (7) once.
•
The current numerical value (5) is set at
the symbol (4) as the lower limit value,
symbol (3) confirms the entry.
à
p. 11 - 146
3 302 690 en
Crane operation
11.7 Working range limiter
11 - 143
Need help?
Do you have a question about the Grove GMK4100L-1 and is the answer not in the manual?