With 7 head
sheaves
Operating manual
GMK4100L-1
The 7th head sheave of the auxiliary single-sheave boom top
this version.
Hook tackle
Reeving
A
3-fall
7-sheave hook block
Reeving
A
14-falls
B
13-fall
1)
Additional equipment;
à
Lattice extension operating manual
2)
Only with special equipment;
3 302 690 en
12.10 Rigging work on the main boom
1)
2)
à
Rigging work
is used for
p. 1 - 7
12 - 119
Need help?
Do you have a question about the Grove GMK4100L-1 and is the answer not in the manual?