6.5 Installing/removing the outrigger beams
6.5.1
H
6 - 30

CHECKLIST: Removing the outrigger beams

This checklist is not a complete operating manual. There are accompanying
operating instructions which are indicated by cross-references.
Observe the warnings and safety instructions specified here!
1. Preparing the truck crane;
2. Label the outrigger beams, retract, release and bolt them to each other;
à
p. 6 - 34.
3. If necessary, remove the outrigger pads;
4. Unscrew the spacer;
5. – Disconnecting hydraulic connections;
– Disconnect the electrical connection if necessary;
à
p. 6 - 35.
à
p. 6 - 40.
3 302 690 en
à
p. 6 - 36.
à
p. 6 - 38.
à
p. 6 - 39.
Operating manual
GMK4100L-1

Advertisement

Table of Contents

Troubleshooting

loading
Need help?

Need help?

Do you have a question about the Grove GMK4100L-1 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF