Triumph TR6 PI Operation Manual page 44

Table of Contents

Advertisement

(49) Check security of suspension fixings, tie-rod levers,
steering unit attachment and steering universal joint
coupling bolts.
Check security of
I.
Suspension fixings,
2.
Tie-rod levers,
3.
Steering unit attachment,
4.
Steering universal joint coupling bolts.
(50) Check security of propeller shaft and drive shaft
universal coupling bolts
1.
Check security of propeller shaft coupling bolts,
which if correct should be tightened to 26 to 34 Ibf ft
(3·6 to 4·7 kgf m).
2.
Check security of half shaft to final drive unit
coupling bolts, which if correct should be tightened
to 26 to 34lbf
ft
(3·6 to 4·7 kgf m).
(51) Check security of sub-frame or body mountings
Using page 06 as a guide
1.
Check security of sub-frame mounting bolts/nuts.
1-
_
MAINTENANCE
~ -
_ _
~
NT2~7IA
(52) Check/report condition of steering unit/joints for
security, backlash and gaiter condition
1.
Check security of steering unit mounting and steering
joints, using page 06 as a guide.
2.
Check steering for backlash.
3.
Check condition of steering gaiters.
4.
Report any defects found.
(53) Adjust front hubs
See 60.25.13
(54)(55) Check/adjust/report front
and
rear
wheel
alignment with tracking equipment.
Front wheel alignment - See 57.65.01
Rear wheel alignment - See 64.25.17
Triumph TR6 Manual. Part NQ. 545277 Issue 1
10.00.19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tr6 tc

Table of Contents