Triumph TR6 PI Operation Manual page 195

Table of Contents

Advertisement

FUEL SYSTEM - TC
mROTILE LINKAGE
- Remove and refit
19.20.07
Removing
1.
Disconnect the horizontal control rod from the
throttle pedal countershaft lever.
2.
Remove the relay lever support bracket from the
carburetters.
3.
Remove the nut and disconnect the short control rod
from the interconnection lever.
4.
Remove the throttle linkage complete.
Refitting
5.
Check the length of the long horizontal and short
vertical control rods - see DATA.
6.
Refit the relay lever support bracket.
7.
Fit the short vertical control rod assembly to the
interconnection lever.
8.
Slacken the spring coupling bolts.
9.
Reconnect the long horizontal control rod to the
throttle countershaft lever.
10.
Check that the relay lever is against its stop.
I I.
Insert a 3/32 in (2'4 mm) drill shank between the
tongue and slot of the throttle interconnection lever.
12.
Tighten the spring coupling nuts and bolts.
13.
Tune and adjust the carburetters 19.15.02.
DATA
Horizontal control rod length between ball joint centre and
centre of free end 11'94 in (303'3 mm):
, Vertical control rod length between ball joint centres
3'18 in (80.8 mm)
19.20.07('
2·6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tr6 tc

Table of Contents