Mitel SX-200 Practices page 635

Hide thumbs Also See for SX-200:
Table of Contents

Advertisement

4
.
INSTALLATION
General
4. I-
Installation to meet the Traffic Measurement requirements consists of the following
steps:
I, Determine the required traffic parameters.
2, Determine the required output device.
3. Install the output device.
4. Program the traffic parameters and output device for this installation.
Connection Requirements, Local Prhter
4.2
Practice 9109-096-200-NA,
Installation Information, details the installation of
SX-ZOO DIGITAL PABX systems. Refer to Practice 9109-096353-NA,
General
Maintenance Information, and reference System Set Commands.
This section
explains how to assign printers during installation and to perform initial maintenance
programming. The Traffic Measurement data may be output to a printer, magnetic
recording device, or the maintenance terminal. If required, a Data Demultiplexer may
be used and the Traffic Measurement data directed to one output of it.
When a backplane printer port is used, it should be located as near as possible to the
PABX and connected to the PABX data port with a 25-conductor connectorized cable,
not longer than 4.5 m (15 ft) in length.
A Printer may be specified in CDE Form 34, Directed IQ which will allow all Traffic
Measurement printouts to be sent to this printer which is connected to a port equipped
with an asynchronous data set. Refer to Practice 9109-096210-NA,
Customer Data
Entry, for further details.
Note:
Ensure that the length of time the printer requires to print one report is less than the length
of time specified for a traffic measurement
period; otherwise, reports will be generated
faster than the printer can print them.
9109-09fS45O-NA
Issue 1
Revision 0
450 4-l

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents