NEC NEAX 2000 Programming Manual page 217

Integrated voice server, integrated multimedia exchange
Hide thumbs Also See for NEAX 2000:
Table of Contents

Advertisement

PLO
The PLO (Phase Locked Oscillator) equipped on the MP card is responsible to synchronize the
system to the digital network clock.
When the PBX is a clock receiver office, the PLO generates the clock signals according to the
source clock received from the source office within the network. The source clock signals are ex-
tracted at DTI cards and supplied to the PLO. Two clock routes are available; one is the route 0
from the source office, and the other is a standby route 1 from a sub-source office. When no clock
signals arrive from the source and sub-source office, due to a transmission line failure, the PLO
keeps generating the clock signals at the frequency of the previous source clock. The PLO can
receive different frequency of source clocks from the route 0 and route 1.
Figure below shows an example of clock supply route when the system is a receiver office.
SOURCE OFFICE
TDSW
SOURCE
CLOCK
~
PLO
DTI 0 and DTI 1 must be mounted in PIM0.
NOTE:
Clock Supply Route
SUB-SOURCE OFFICE
DTI
DTI
DTI
RECEIVER OFFICE
DTI
– 197 –
DIRECT DIGITAL INTERFACE (DDI)
RECEIVER/LOCAL-RECEIVER OFFICE
TDSW
DTI
DTI
PLO
TDSW
DTI
DTI
PLO
TDSW
DTI 0
DTI 1
PLO
PBX
NOTE
: DIRECTION OF CLOCK
SIGNAL SUPPLY
PLO
A2195-10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Neax 7400 ics m100mx

Table of Contents