General Commissioning Information - Siemens SIMODRIVE 611 universal Function Manual

Control components for closed-loop speed control and positioning
Table of Contents

Advertisement

4 Commissioning
4.1

General commissioning information

4.1
General commissioning information
Commissioning
4-116
The following differentiation is made when commissioning the
"SIMODRIVE 611 universal" control board:
S
First commissioning
If there is still not a matching parameter set for the drive, then the
drive must be commissioned for the first time.
The drive can be commissioned for the first time using
– the SimoCom U tool
– the display and operator unit
S
Series commissioning
An existing data set can be transferred to the control board via the
SimoCom U tool (refer to Chapter 4.3.2).
Examples:
– Several systems having the same configuration and functions
are to be commissioned.
For the first system, a first commissioning must be executed,
and for additional systems, a series commissioning.
– Replacing a control board.
Note
S
SimoCom U is a start–up tool for "qualified commissioning
personnel"
S
SimoCom U has neither been designed nor is suitable for
operational control of the system!
S
When called via several PCs, only that PC displays modified data,
from which the changes were also made!
Note
The original status of the board when shipped can always be
re–established as follows:
S
via P0649 = 1 (from SW 3.1)
S
via the SimoCom U tool using the "boot board" function (from
version 03.03)
SIMODRIVE 611 universal Description of Functions (FBU) – 04.05 Edition
(refer to Chapter 4.3.1)
(refer to Chapter 3.2.1)