Commissioning The Board With "Simocom U - Siemens SIMODRIVE 611 universal Function Manual

Control components for closed-loop speed control and positioning
Table of Contents

Advertisement

01.99
10.99
! not 611u !
1.4.4

Commissioning the board with "SimoCom U"

Requirements
The following prerequisites must be fulfilled in order to be able to com-
mission a drive using the "SimoCom U" parameterizing and start–up
tool:
1. All of the prerequisites for commissioning are fulfilled, according to
2. The checklist for commissioning according to Chapter 4.1 has been
3. The optional PROFIBUS–DP3 module is inserted into the control
4. The "SimoCom U" tool is installed on the PC/PG, which is to be
5. There is a connecting cable between the PG/PC and control board
6. The PC/PG with "SimoCom U" is connected to the control board
Reader's note
S
S
E Siemens AG 2005 All Rights Reserved
SIMODRIVE 611 universal Description of Functions (FBU) – 04.05 Edition
1.4
"SIMODRIVE 611 universal E" control board
Chapter 4.1 this means that the system with "SIMODRIVE 611 uni-
versal E" can be commissioned.
checked.
board (refer to Chapter 1.3.3).
used to commission the drive.
(RS232 connecting cable, refer to Chapter 2.5).
(X471).
Cable diagrams for the connecting cable
Everything about "SimoCom U"
1 Product Overview
refer to Chapter 2.5
refer to Chapter 3.3
1-53
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simodrive 611 universal e

Table of Contents