Optional) Enabling Alarms To Be Sent To The Nm Station After The Ftp Transmission Succeeds; Starting The Test Instance - Huawei S9300 Configuration Manual

Table of Contents

Advertisement

S9300&S9300E Terabit Routing Switch
Configuration Guide - Network Management
Context
Do as follows on the NQA client:
Procedure
Step 1 Run:
system-view
The system view is displayed.
Step 2 Run:
nqa-ftp-record time time
The duration of saving test results to the FTP server through FTP is configured.
----End
6.32.6 (Optional) Enabling Alarms to Be Sent to the NM Station
After the FTP Transmission Succeeds
After test results are successfully saved on the FTP server, a trap message is sent to the NMS
for notification.
Context
Do as follows on the NQA client:
Procedure
Step 1 Run:
system-view
The system view is displayed.
Step 2 Run:
nqa-ftp-record trap-enable
Alarms are configured to be sent to the NM station after the FTP transmission succeeds.
When the FTP transmission succeeds at the first time, no alarm message is generated. From the
second time on, each time when the FTP transmission succeeds, an alarm message is generated.
----End

6.32.7 Starting the Test Instance

After you start a test instance, test results are field periodically.
Context
Do as follows on the NQA client:
Issue 01 (2012-03-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 NQA Configuration
375

Advertisement

Table of Contents
loading

This manual is also suitable for:

S9300e

Table of Contents