Procedure
Step 1 Run the display trapbuffer [ size value ] to view the trap messages sent in an NQA test.
----End
Example
Run the display trapbuffer [ size value ] command. If information about the trap messages is
displayed, it means that the configuration succeeds.
For example:
<Quidway> display trapbuffer size 2
Trapping buffer configuration and contents:enabled
Allowed max buffer size : 1024
Actual buffer size : 256
Channel number : 3 , channel name : trapbuffer
Dropped messages : 0
Overwritten messages : 0
Current messages : 11
#May
1.3.6.1.4.1.2011.5.25.110.2.0.1 ShortIFIndexMapTable changed.
#May
1.3.6.1.4.1.2011.5.25.129.2.1.18 Physical entity register succeeded.
(EntityPhysicalIndex=17367040, BaseTrapSeverity=2, BaseTrapProbableCause=70144,
BaseTrapEventType=5, EntPhysicalContainedIn=1677721
6, EntPhysicalName="SRU slot 9", RelativeResource="", ReasonDescription="MPU9")

6.32 Configuring Test Results to Be Sent to the FTP Server

This section describes how to configure the system to send test results to the FTP server to avoid
loss of test results in the event that the NMS does not poll the test result in time.

6.32.1 Establishing the Configuration Task

Before configuring the system to send test results to the FTP server, familiarize yourself with
the applicable environment, complete the pre-configuration tasks, and obtain the required data.
This can help you complete the configuration task quickly and accurately.
Applicable Environment
In the test, the latest five test results can be saved by the system and earlier ones are overlapped.
Therefore, if the NM station does not perform result polling timely, test results are lost. You can
send the statistics on the test results that reach the capacity of the local storage or periodically
send the statistics to the FTP server for storage through FTP. This can effectively prevent the
loss of test results and facilitate the network management based on the analysis of test results at
different times.
Pre-configuration Tasks
Before configuring test results to be sent to the FTP server, complete the following tasks:
l
l
l
Issue 01 (2012-03-15)
6 2009 12:54:17 CBB6-PE3 SINDEX/4/INDEXMAP:OID
6 2009 11:02:37 CBB6-PE3 SRM_BASE/4/ENTITYREGSUCCESS: OID
Configuring the FTP server
Configuring a reachable route between the NQA client and the NM station
Configuring a test instance
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 NQA Configuration
372

Advertisement

Table of Contents
loading

This manual is also suitable for:

S9300e

Table of Contents