6.32.3 Enabling the Function of Saving NQA Test Results Through
FTP
The system can send test results to the FTP server only after the FTP server is enabled with the
test result saving function.
Context
Do as follows on the NQA client:
Procedure
Step 1 Run:
system-view
The system view is displayed.
Step 2 Run:
nqa-ftp-record enable
The FTP server is enabled to save test results.
----End
6.32.4 (Optional) Configuring the Number of Test Results Saved
Through FTP
This part describes how to configure the number of test results that an FTP server can save.
Context
Do as follows on the NQA client:
Procedure
Step 1 Run:
system-view
The system view is displayed.
Step 2 Run:
nqa-ftp-record item-num item-number
The number of test results to be saved on the FTP server through FTP is configured.
----End
6.32.5 (Optional) Configuring the Duration of Saving Test Results
Through FTP
Each time, the system can send two test results to the FTP server. If the FTP server cannot
continue to write the file after being interrupted, a new file is created on the FTP server for the
test results sent each time.
Issue 01 (2012-03-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 NQA Configuration
374

Advertisement

Table of Contents
loading

This manual is also suitable for:

S9300e

Table of Contents