Checking The Configuration - Huawei S9300 Configuration Manual

Table of Contents

Advertisement

S9300&S9300E Terabit Routing Switch
Configuration Guide - Network Management
l Run:
l Run:
Step 6 Run:
start
The NQA test is started.
Select the start mode as required because the startcommand has several forms.
l To perform the NQA test immediately, run the start now [ end { at [ yyyy/mm/dd ]
l To perform the NQA test at the specified time, run the start at [ yyyy/mm/dd ] hh:mm:ss
l To perform the NQA test after a certain delay period, run the start delay { seconds second
----End

6.19.3 Checking the Configuration

After configuring the ICMP jitter test, you can view the test result.
Prerequisites
The configurations of the ICMP Jitter Test function are complete.
Issue 01 (2012-03-15)
NOTE
The probe-count command is used to configure the number of times for the jitter test and the jitter-
packetnum command is used to configure the number of test packets to be sent during each test. In
actual configuration, the product of the number of times for the jitter test multiplied by the number of
test packets must be less than 3000.
interval { milliseconds interval | seconds interval }
The interval for sending test packets is set.
The shorter the interval is, the sooner the test is complete. However, delays arise from sending
and receiving test packets on the processor. Therefore, if the interval for sending test packets
is set to a small value, a relatively greater error may occur in the statistics of the jitter test.
fail-percent percent
The percentage of the failed NQA tests is set.
hh:mm:ss | delay { seconds second | hh:mm:ss } | lifetime { seconds second | hh:mm:ss } } ]
command.
The test instance is started immediately.
[ end { at [ yyyy/mm/dd ] hh:mm:ss | delay { seconds second | hh:mm:ss } | lifetime
{ seconds second | hh:mm:ss } } ] command.
The test instance is started at a specified time.
| hh:mm:ss } [ end { at [ yyyy/mm/dd ] hh:mm:ss | delay { seconds second | hh:mm:ss } |
lifetime { seconds second | hh:mm:ss } } ] command.
The test instance is started after a certain delay.
NOTE
NQA test results cannot be displayed automatically on the terminal. You should run the display nqa
results command to check the test results.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 NQA Configuration
319

Advertisement

Table of Contents
loading

This manual is also suitable for:

S9300e

Table of Contents